logo
Welcome to Shanghai Terrui International Trade Co., Ltd.
+86-13764679640

4m Heated Water Trough 300L With 1800W Thermostat Control For Extreme Cold Livestock Farms

Basic Properties
Place of Origin: China
Brand Name: Terrui
Certification: ISO9001
Model Number: TPT401BLH
Trading Properties
Minimum Order Quantity: 50pcs
Price: discuss
Payment Terms: T/T, L/C
Supply Ability: 1000
Product Summary
When Insulation Alone Is Not Enough An insulated trough handles ordinary frost. In a prolonged cold snap with wind chill well below freezing, even a well-built wall needs help, and that is where a controlled heating kit earns its place. Heating specification Length4000 mm, six drinking positions ...

Product Details

Highlight:

56 Duck Egg Incubators

,

Temperature Control Duck Egg Incubators

,

Duck Egg Incubators 80W

Material: Polyethylene
Product Name: 4m Waterer Trough With 6-Holes
Item Code: TPT401BLH
Height Of Drinking: 480mm
Advantage: Easy And Cheap,high Quality
Size: 400*67*68cm
Capacity: 300L
Usage: For Cow Drinking
Product Description

When Insulation Alone Is Not Enough

An insulated trough handles ordinary frost. In a prolonged cold snap with wind chill well below freezing, even a well-built wall needs help, and that is where a controlled heating kit earns its place.

4m heated livestock water trough with thermostat control

Heating specification

Length4000 mm, six drinking positions
Capacity300 L
Heating elements6 sets at 300 W each
Total heating load1800 W, adjustable in two stages
Thermostat range5 C to 40 C, built in
Drinking height480 mm
RefillFloat valve, 100 to 120 L per minute

How the control works

A built-in thermostat reads water temperature and switches the elements in stages, so the trough heats only when it needs to. Setting the target a few degrees above zero keeps the surface open without wasting energy on warm water that cattle will not drink anyway. The two-stage arrangement also means a single failed element does not take the whole trough offline.

Running cost

Power draw is proportional to heat loss, not to the size of the element. In a well-insulated body with a cover in place, the elements cycle instead of running continuously, and the annual cost is usually far lower than a continuously energised open heater.

Installation

Bring a dedicated supply to the trough end with an RCD, earth the body, and route the cable in conduit above ground where it can be inspected. Set the thermostat after the first fill, once the water has settled to ground temperature.

Maintenance before winter

Test each element in autumn, check the thermostat against a thermometer, and confirm the earth connection. Replace a failed element before the first hard freeze rather than during it.

Tell us the lowest recorded temperature at the site and the power available, and we will confirm the heating configuration for your shed.

RELATED PRODUCTS

Send An Inquiry